NTDC to Carry Out Repair And Maintenance Work At Grid Station Tomorrow Admin Apr 17, 2020 LAHORE-- The spokesman of the National Transmission and Despatch Company Ltd (NTDC) has said that the maintenance and repair work…
Chinese Energy Engineer Group Donates 10,000 Face Masks For NTDC Employees Admin Mar 31, 2020 LAHORE - Chinese Energy Engineer Group “Jiangsu Power Design Institute Company Limited” has donated 10,000 Medical Face Mask for…
Construction Work On 4,000MW Matiari-Lahore Transmission Line In Full Swing Admin Mar 17, 2020 LAHORE -. The construction work on ±660 kV High Voltage Direct Current (HVDC) Matiari-Lahore transmission line under CPEC project…
NTDC Completes Double Circuit Transmission Line, Now Connected With 220 kV Grid Station Ghazi Road… Admin Mar 2, 2020 LAHORE-- In line with the System Constraints Removal Plan, the National Transmission and Despatch Company (NTDC) has successfully…
NTDC To Construct 220 kV Substation At Jhimpir Sindh Admin Feb 27, 2020 LAHORE- In order to induct 956 MW power from wind power projects to the system, the National Transmission and Despatch Company…
Kite Flying Causing Tripping of NTDC Transmission Network Admin Feb 18, 2020 LAHORE-- The spokesman of the National Transmission and Despatch Company Limited (NTDC) has said as many as 23 incidents of…